We're all finally breathing a sigh of relief because the worst of the summer heat is behind us—and we know, it's not the prettiest #tbt. However, in this small window while the leaves are still on the branches, the sun is shining, the breeze is blowing, and when we can actually enjoy the outdoors without breaking the bank, it is important to look back at the summer behind us and reflect on the summers yet to come. coming up Research shows that in the coming decades, summer temperatures will go up to 45 degrees, and in urban areas up to 50 degrees.

We have already written about the practice of publishing plans for early public and public inspection during the summer months, and how green areas were treated within those planning solutions. Let's remember that these green areas are a key factor in the city's adaptation to climate change. Well-planned greenery can contribute to improving microclimatic conditions and increasing resistance to extreme weather conditions. In order to realize this, it is necessary to take a strategic approach to urban planning that does not only look at the short-term (mainly monetary) interests of (individuals), but considers the long-term development of the city. 

Given that Belgrade has not adopted a General Urban Plan, and that the Plan for the General Regulation of the System of Green Areas, although a key document that regulates the development of green infrastructure, is treated as an orientational one, we have no choice but to interpret the vision of the city we live in through the lines. and what she brings us in the future. 

Below is an overview of 19 urban and 4 spatial plans that were open to the public during the summer. Although spatial plans for parts of Surčin and Grocka municipalities foresee an increase in forests, which is really good news, other plans do not inspire optimism. The data that is quite worrying is that about 58ha of green areas were not evaluated as such, that is, they were not recognized as green areas within the scope of the plan, but as undeveloped land. This kind of treatment of wild greenery can be very disastrous since it invokes the lack of formal protection, categorization or maintenance, and thus tries to justify the concretization of every square centimeter of naturally regulated surfaces. On the other hand, public green areas, which enjoy a slightly higher degree of protection, and whose improvement should be one of the priorities of the city's development, make up only 1.84% of the total area of ​​all processed urban plans. 

With these practices, it seems to us that Belgrade's only achievable goal is to become the scenery for the next Blade Runner, what about you?

RJU / JU plan name (abbreviated) change of public green areas non-valuation of green areas on the site planned public green areas in the area of ​​the plan plan area
RYU PDR for the area between the streets: Todora od Stalać, Jovan Rajić, Sazonova, Đerdapska, Južno boulevard and the planned route of the UMP + 0,07 ha /

13,5 %

1,19 ha

8,8 ha
RYU PDR for Mali Mokri Lug settlement, Zvezdara municipality (Phase 1)  / 0,26 ha of actual greenery (11% of the plan) is treated as undeveloped land

0%

0 ha

2,3 ha
RYU PP part of the city municipality of Grocka + 4357 ha (forest) /

28,3% (forests)

6300 ha

22272 ha
RYU PDR for the block between the streets of Poenkareova, Jovana Avakumovića, Bulevar despota Stefana and Mitropolita Petra / /

0%

0 ha

8,87 ha
RYU  PDR area between Auto-put and SMT, Mali Mokri Lug / 23 ha of actual greenery (70% of the plan) is treated as undeveloped land

0%

0 ha

32,4 ha
RYU  PDR area between the streets: Ptujska, Dragoslav Srejovića and Oštreljska - 0,05 ha 0,4 ha of actual greenery (20% of the plan) is treated as undeveloped land

11 %

0,24 ha

2,2 ha
RYU  PDR of Dimitrija Tucović for the block between Dalmatinska, Vojvoda Brana and Lazar Dokić streets / /

1%

0,01 ha

1,37 ha
RYU PDR part I of the local community of Jajinci settlement / 24,7 ha of actual greenery (95,6% of the plan) is treated as undeveloped land

0%

0 ha

25,8 ha
RYU PP part of the City Municipality of Surčin + 1262 ha (forests) /

25,7% (forests)

5309 ha

20656 ha
RYU PDR of Ada Ciganli - 2,7 ha /

0%

0 ha

9,9 ha
RYU PDR of the Orthodox cemetery in Surčin - 4,56 ha /

0%

0 ha

9,96 ha
RYU PPPPN for the development of part of the waterfront of the city of Belgrade - the area along the Sava River for the Belgrade on Water project + 19,16 ha /

12 %

39,8 ha

331,4 ha
RYU PDR of the Street of Work Actions in Železnik, from Milinka Kušić to Avalska Street - 0,48 ha /

3,62 %

0,08 ha

2,21 ha
RYU PDR of the Jasika economic zone along the ring road + 0,26 ha /

2,8 %

0,26 ha

9,4 ha
RYU PDR for the part of Block 63 between the streets: Nehruova, Japanska and Evropska - 0,65 ha /

20 %

1,5 ha

7,5 ha
JU PDR area between Jurija Gagarina and Zemunska streets (IMT) / /

0%

0 ha

36,15 ha
JU PDR area along Kralja Aleksandra Boulevard, between Ustanička and Partizanska streets / It is not known how much is the area of ​​actual greenery in the immediate vicinity of the water reservoir, which is treated as undeveloped land and repurposed for housing.

0%

0 ha

29,69 ha
JU PDR of the wider area next to the Clinical Hospital Center 1,89 ha of actual greenery (100% of the plan) is treated as undeveloped land, and it is stated that there is a forest on the site

0%

0 ha

1,89 ha
JU PDR area between the streets: Nova kumodraška, Darvinova, and Braće Jerković + 0,18 ha 3,8 ha of actual greenery (56% of the plan) is treated as undeveloped land

3%

0,2 ha

6,7 ha
JU PDR area along Volga Street + 0,05 ha 0,45 ha of actual greenery (36% of the plan) is treated as undeveloped land

4%

0,05 ha

1,27 ha
JU PDR part of Višnjička banja between the streets: Despotovačke, Darinke Jevrić, Draginje Adamović and Nedeljka Košanina + 0,4 ha 3 ha of actual greenery (31% of the plan) are treated as other green areas and are completely abolished

4%

0,38 ha

9,5 ha
JU PPPPN "BIO4 Campus" / 10,4 ha of actual greenery (31,3% of the plan) is treated as undeveloped land

0%

0 ha

33,2 ha
JU PDR area between Bulevar heroja from Košar, Tošin bunar street and railway land / /

0%

0 ha

6,03 ha
in total

- 7,4 ha 

(within urban plans)

- 57,5 ha
(actual greenery/undeveloped land that was not valued as green areas in the plans; within the urban plans)

3,91 ha

(1,84% of the total area of ​​urban plans)

211,94 ha

(area of ​​urban plans)

+ 5638,16 ha 

(within spatial plans)

- 10,4 ha

(actual greenery that was not evaluated as green areas in the plans; within spatial plans)

11649 ha

(26,9% of the total area of ​​spatial plans)

43292,6 ha

(area of ​​spatial plans)

RELATED TEXTS

Why don't we abolish planning?

Why don't we abolish planning?

Do you remember the first episode of South Park season 15 where Kyle, agreeing to the terms of service without reading…

A year marked by urban greed

A year marked by urban greed

Another year is behind us in which, unfortunately, the lives and health of citizens were collateral damage...

Sign for green

Sign for green

When we remember our childhood, we first remember the fun and games through which we learned about ourselves, about the community and...

Land is a limited resource

Land is a limited resource

Land is a limited resource on which there are forests, fields and seas, on land we build our homes...

Where's the plan?

Where's the plan?

You've probably noticed that you can't publish and announce urban plans and projects just like that...

Report from the fourth forum

Report from the fourth forum

The development of Rušnja through the perspective of the needs of its residents: report from the fourth mini-citizen assembly...

Report from another forum

Report from another forum

At the beginning of 2022, we held two participatory forums with the topic of General Urban Planning...

BELGRADE 2041

BELGRADE 2041

We are in a very specific moment - the preparation of the Belgrade General Urban Plan is underway...

Report from the third forum

Report from the third forum

On Saturday, March 26, 2022, the fourth participatory forum was held, the topic of which was the Draft PGR...

GUP Belgrade 2041 remarks

GUP Belgrade 2041 remarks

An early public inspection of the General Urban Plan of Belgrade until 2041 is underway. Three years after...

PGR BELGRADE: remarks

PGR BELGRADE: remarks

Today, January 21, is the last day for submission of objections to the draft amendments to the general plan...

Belgrade on the water: REMARKS

Belgrade on the water: REMARKS

Public review of the draft amendments and additions to the spatial plan for the "Belgrade on Water" project is underway. Already...

National Stadium: REMARKS

National Stadium: REMARKS

Public inspection of the Spatial Plan of the special purpose area of ​​the national football...

PGR: the development of Belgrade in the shadow of the holidays

Pandemic ≠ excuse

The city of Belgrade is grossly violating civil rights in its efforts to enact harmful and...

Agelast: Ministry of Space

Agelast: Ministry of Space

"They are on the front line of the current fight for Košutnjak, the founders of "Ne davimo Beograd...